How Long Does It Take to Install a Split System?

20 November 2026

How Long Does It Take to Install a Split System?

It’s the first properly hot week of the season, the bedroom upstairs is unbearable by 9pm, and you’ve finally decided to put a split system in. The next question is nearly always the same one: how long does it take to install a split system, and will I need to take the whole day off work?

The honest answer is that the job itself is usually shorter than people expect, and the wait before the job is often longer. Below is how the day actually runs, what stretches it out, and how to avoid losing a week of summer waiting for a booking.

A simple single split is normally a one visit job

The quickest installation we do is what the trade calls a back-to-back. The indoor unit goes on an outside wall and the outdoor unit sits directly behind it on the other side of that wall. The pipes, power cable and drain only travel through the wall itself, so there’s very little to run and very little to hide.

For a job like that, we arrive, install, test and hand over the remote in the one visit, with time left to show you how the settings work. Most single split installs in a typical Central Coast house fall into this category or close to it.

Things change once the outdoor unit can’t sit directly behind the indoor one. That’s not a problem. It just means more pipe, more work and more of your day.

What we’re actually doing while we’re there

People are sometimes surprised by how much of the day happens away from the bit they can see. Here’s the order of work on a standard install:

  • Drop sheets down and the indoor position marked out, level and clear of studs and wiring
  • The wall bracket fixed and a hole cored through the wall for the pipes, cable and drain
  • The outdoor unit set on a pad, wall bracket or stand, with clearance for airflow
  • Copper refrigerant lines flared and connected at both ends
  • The lines pressure tested, then vacuumed out
  • Refrigerant released, the system run up and checked in cooling and heating
  • A tidy up, the pipe covered, and a walk through the remote with you

The vacuum step is the one we never rush. Before the refrigerant goes in, every bit of air and moisture has to be pulled out of the pipes. Moisture left inside a new system turns into acid over time and quietly shortens the life of the compressor. A good installer would rather spend the extra time here than come back a few years later to a failed unit. It’s also why refrigerant work is legally restricted to licensed technicians.

If you’d like to see what our split system installation service covers from quote to handover, it’s all laid out on that page.

Five things that turn a short job into a long one

When an install runs longer than a back-to-back, it’s almost always for one of these reasons.

The pipe has to travel

If the outdoor unit needs to go down the side of the house, around a corner or out of sight of a neighbour’s bedroom window, the pipes go with it. Running them through the roof space or under the floor takes longer than running them across an outside wall, but it looks far neater. We’ll talk you through both options when we quote.

The walls are solid brick

Coring through weatherboard or fibro is quick. Solid brick takes noticeably longer and makes more dust, so we take extra care with drop sheets and furniture nearby.

Height and access

A second storey bedroom with the outdoor unit on the ground means a longer pipe run and working off ladders or a platform. Steep blocks, which we see plenty of around Terrigal, Kariong and the hills behind Gosford, can make getting the outdoor unit into place a two person job on its own.

The switchboard needs work

A split system needs its own circuit from the switchboard. In a newer home there’s usually room for it. In an older home the switchboard may be full or out of date, and that electrical work has to be done before the new system can be connected. This is the single most common reason a job runs over, and it’s why we look at the switchboard when we quote.

An old unit is coming out first

If you’re replacing a tired old system, the refrigerant in it has to be properly recovered before anything is disconnected. The old brackets come down, the wall gets patched where needed, and only then does the new install start. Sometimes the old pipework can be reused, often it can’t.

Multi-head systems and several rooms take a full day or more

Putting in two or three separate split systems, or one outdoor unit running several indoor heads, is a bigger job. Each indoor unit has its own bracket, wall hole and pipe run, and every run needs its own pressure test and vacuum. Plan on a full day for most of these, and occasionally a second morning if the access is tricky.

If you’re weighing up one outdoor unit against several, our post on multi head split systems and who they suit covers the trade offs, including what happens to every room when the shared outdoor unit needs a repair.

The wait for a booking is often longer than the install

This one catches people out every summer. The installation might only take part of a day, but getting from “we should get air con” to a working system involves a quote, choosing the unit, checking it’s in stock and finding a slot in the diary.

In spring, that whole process moves quickly. Once the first heatwave arrives, every installer on the Coast gets the same flood of calls in the same week, and popular models can run short at suppliers. If you’re reading this in late November, the best thing you can do is get your quote booked now rather than waiting for the next scorcher to make the decision for you.

It also helps to have the size sorted before the quote. Choosing the wrong capacity is the mistake we see most, and our guide on choosing the right split system for your home is a good place to start.

How to help the day run smoothly

You don’t need to do much, but a few things make a real difference:

  • Clear the furniture away from the inside wall, and from the spot outside where the unit will sit
  • Make sure we can get to the switchboard and, if pipes are going through the ceiling, the manhole
  • Keep pets in another room, since the front door and side gate will be opening a lot
  • Be home at the end so we can walk you through the remote and settings

If you live close to the beach, in Avoca, Umina or The Entrance for example, it’s worth mentioning when we quote. Where the outdoor unit goes affects how much salt spray it cops, and a little extra pipe to get it out of the direct wind can add years to its life.

Common questions about split system installation time

Can a split system be installed in one day?

Yes. A single split system in a typical home is installed, tested and running in one visit. Jobs that need switchboard work, long concealed pipe runs or several indoor units may stretch to a full day or a second visit, and we’ll tell you that up front when we quote.

How long does it take to replace an existing air conditioner?

Usually a little longer than a brand new install, because the old refrigerant has to be recovered and the old unit removed before work starts. If the new unit can go in the same position and the electrical circuit is still suitable, the difference is small.

Do I need to be home during the installation?

Someone needs to let us in and be around at the end for the handover, so we can show you the controls and answer questions. In between, you’re free to get on with your day, though most people find it handy to be on hand in case a decision about pipe routing comes up.

Does a split system installation need an electrician?

Yes. In NSW the electrical connection has to be done by a licensed electrician, and the refrigerant work has to be done by a licensed refrigeration technician. If your switchboard needs an upgrade, that electrical work is done before the system is connected.

How soon can I use my split system after installation?

Straight away. We run the system in cooling and heating before we leave to check everything is working, so by the time we hand you the remote it’s ready to use.

When is the best time of year to install a split system?

Spring and autumn. Installers are less busy and models are easier to get, so you can choose the unit you want rather than whatever’s left. Booking ahead of summer also means the system is in before you actually need it.

Get a quote that tells you exactly how long your job will take

Every home is a little different, so the best way to know how long yours will take is to have someone look at it. With over 15 years of experience on the Central Coast, we’ll check the walls, the switchboard and where the outdoor unit can sit, then give you a transparent, upfront quote with a realistic timeframe. Have a look at our split system air conditioning installs and get in touch before the summer rush fills the diary.